Showing posts with label FA-18 SUPER HORNETS. Show all posts
Showing posts with label FA-18 SUPER HORNETS. Show all posts

Tuesday, March 24, 2015

DTN News - AIR SHOW: Melbourne Air & Space Show Rocks Florida's Space Coast

DTN News - AIR SHOW: Melbourne Air & Space Show Rocks Florida's Space Coast 
Source: DTN News - - This article compiled by K. V. Seth from reliable sources Spaceflight Insider
(NSI News Source Info) TORONTO, Canada - March 24, 2015 (MELBOURNE, Fla):  The skies above the Melbourne International Airport roared with the sounds of jet and propeller-driven aircraft this weekend. The show was held from March 21-22 and included the U.S. Navy Blue Angels, the F-22 Raptor demonstration team, U.S. Air Force F-16 Viper Demonstration Team – and an array of other government and civilian organizations.


From our perspective in the control tower, the show comes across as an exercise in logistics. In particular, we were able to witness first-hand the interaction between the air-traffic control tower, the “show boss” who controls the airspace during the rehearsals, and the show and the Blue Angels administrative officer they send to the tower. The coordination involved – is nothing short of amazing.


Melbourne Air and Space Show - Friday Dress Rehearsals F-16 Viper Demonstration Team photo credit Michael Seeley SpaceFlight Insider
An F-16 leaves its wake in the sky. Photo Credit: Michael Seeley / SpaceFlight Insider

Another aspect that was particularly notable is that the show’s producers value partnerships with schools and universities. The reason behind these efforts is to inspire youth to pursue education and fields that relate to Science Technology Engineering and Math, more commonly known as “STEM”. Brevard Schools sent students out to see the U.S. Navy’s Blue Angels arrive, and the Florida Institute of Technology’s College of Aeronautics students and faculty were on hand at a “hangar party”.

SpaceFlight Insider was surprised to find how maneuverable the C-130 – called “Fat Albert” – that the Blue Angels utilizes is.


The U.S. Navy Blue Angel Demonstration Team in their F/A-18 Hornets fly in a tight formation during rehearsals caried out on March 19, 2015. Photo Credit: Michael Seeley / SpaceFlight Insider

Major Dusty Cook (USMC) is one of the aircraft’s pilots. He spoke about how his performance (steep climbs, tight turns and a fast landing with a very short stop) serves to demonstrate the capabilities of the C-130. Cook detailed that he has a special sense of responsibility toward the iconic aircraft and its vital role in allowing the Blue Angels to perform.


Fat Albert carries pallets of repair supplies and equipment to maintain the Blue Angels fleet, and 40-60 mechanical/maintenance staff. Cook noted that he and the team he works with strive to maintain the craft within operational specs.


“I’m leaving it for someone else to fly, so I feel a duty and obligation to turn it over in perfect condition,” Cook said.

*Related Images of Melbourne Air & Space Show;






*Link for This article compiled by K. V. Seth from reliable sources Spaceflight Insider
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*Photograph: IPF (International Pool of Friends) + DTN News / otherwise source stated
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Friday, June 1, 2012

DTN News - DEFENSE NEWS: India-Built Sub-Assembly On US Navy's Combat Planes

Defense War News Updates: DTN News - DEFENSE NEWS: India-Built Sub-Assembly On US Navy's Combat Planes
Source: DTN News - - This article compiled by Roger Smith from reliable sources Military & Aerospace
(NSI News Source Info) TORONTO, Canada - June 1, 2012:  An India-built electronic sub-assembly will be part of the US Navy's combat planes, a statement said Wednesday as Indian companies step up efforts to be part of the global defence supply chain.

The sub-assembly provides the cockpit flood lighting compatible with the aircraft's night vision imaging system (NVIS).


American aerospace major Boeing has delivered the first EA-18G Growler aircraft fitted with a cockpit sub-assembly produced by Indian public sector defence electronics major Bharat Electronics Limited (BEL) to the US Navy on May 3, a statement from the firm said.

Boeing has also extended a contract signed with BEL for another year for supplying the sub-assembly for Boeing military planes.

Boeing had awarded BEL an initial contract in March 2011 for work on F/A-18 Super Hornet combat plane cockpit sub-assemblies.

That contract included options to renew annually for up to four years. "As a result of BEL's demonstrated performance, Boeing recently exercised an option to renew the contract for another year," it said.

August 2009, EA-18G Growlers from Electronic Attack Squadron 129 (VAQ-129) and Electronic Attack Squadron 132 (VAQ-132) completed their first at-sea carrier-arrested landing aboard the USS Harry S. Truman (CVN-75). The first deployable EA-18G squadron is to be VAQ-132 "Scorpions", which reached operational status in October 2009. The first Growler operational deployment was announced on 17 February 2011.

In service, the EA-18's radio name during flight operations will be "Grizzly". The "Growler" nickname sounded too much like the EA-6B's "Prowler" name, so "Grizzly" will be used to avoid confusion. With the termination of the EB-52H standoff jammer, the Growler will become the sole remaining manned tactical jammer and Air Staff requirements director Maj. Gen. David Scott has indicated that the USAF will seek to provide electronic warfare officers to fly on US Navy Growlers, without providing funding to purchase additional aircraft. By May 2011, 48 Growlers had been delivered to the U.S. Navy.


The EA-18G was first used in combat during Operation Odyssey Dawn, enforcing the UN no-fly zone over Libya. The five EA-18Gs of VAQ-132 were redeployed from Iraq to Italy to support Libya operations.

Australia: In 2008 the Australian Government requested export approval from the US government to purchase up to six EA-18Gs, which would be part of the order for 24 F/A-18F Super Hornets. On 27 February 2009, Defence Minister Joel Fitzgibbon announced that 12 of the 24 Super Hornets on order would be wired on the production line for future fit-out as EA-18Gs. The additional wiring would cost A$35 million. The final decision on conversion to EA-18Gs, at a cost of A$300 million, will be announced in March 2012.

*Link for This article compiled by Roger Smith from reliable sources Military & Aerospace
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS 

Friday, March 2, 2012

DTN News - DEFENSE NEWS: U.S. DoD Awarded Contract To Raytheon For Radar & Electronic Systems Related To U.S. Navy F/A-18

Defense War News Updates: DTN News - DEFENSE NEWS: U.S. DoD Awarded Contract To Raytheon For Radar & Electronic Systems Related To U.S. Navy F/A-18
(NSI News Source Info) TORONTO, Canada – March 2, 2012: Raytheon Co., Space and Airborne Systems, Goleta, Calif., is being awarded a $77,267,880 modification to a previously awarded firm-fixed-price contract (N00019-09-C-0052) to exercise an option for 89 full rate production Lot 14 AN/ALR-67(V)3 radar warning receivers, and nine countermeasure signal processor weapons replacement assemblies. 
 The AN/ALR-67(V)3 enhances pilot situational awareness by providing accurate identification, lethality, and azimuth displays of hostile and friendly emitters.  It also controls the electronic warfare data bus and interfaces with electronic warfare systems, the onboard radar, airborne mission computer, and the F/A-18 weapon systems. 

Work will be performed in Forest, Miss. (34 percent); Lansdale, Pa. (18 percent); Goleta, Calif. (17 percent); Chatsworth, Calif. (11 percent); San Diego, Calif. (10 percent); Sydney, Australia (4 percent); Milwaukie, Ore. (3 percent); and McKinney, Texas (3 percent). 

Work is expected to be completed in December 2014.  Contract funds will not expire at the end of the current fiscal year. 

The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

*Link for This article compiled by Roger Smith from reliable sources DTN News & U.S. DoD issued No. 142-12 February 29, 2012
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS